Seminars Archive


Fri 5 Oct, at 14:30 - 53 room

TMB Meeting

Abstract
1) Imperial College Access Grid Room (Top floor William Penny Building) will be available both for demonstration set up and rehearsal of the review both Saturday and Sunday. A general rehearsal is expected by Sunday , at 2 pm (uk time) 2) demonstrations are expected from all the 7 applications. During the TMB the status has been verify for Elettra control , CMS, IDS, Meteo and Device Farm. Power Grid and geo-hazards have been not reported. I ask to the representatives of these applications to provide the status and their plans for the final review 3) It has been underlines that QoS is one of the weaker points of the project. PR has been not included in the final release due to a strong instability found in its deployment. Both IE and workflow engine are QoS aware, but we never successed to integrate all the components (PR, WfMS and IE) together. This is a clear fault of the project and the reviewers will point the finger on this. we should share a common view of the problem, underlining the positive aspects (WfMS and IE) and try to find a strong justification for the PR. I\'m sure both Peter and Roger have to say something about this. 4) the periodic management report is here reported http://www.gridcc.org/getfile.php?id=2045 , the final one here http://www.gridcc.org/getfile.php?id=2044 5) all the deliverables and documents have been uploaded in the gridcc site. Please give a look to your documents from the reiviewers entry point. You can access from the \"Document for reviewers\" http://www.gridcc.org/reserveddocuments.php link.

Last Updated on Tuesday, 24 April 2012 15:21